Photo: David Ashby, Technical Director , Tilt Consulting. Courtesy of Tilt Consulting.
Tilt Consulting are delighted to share a recent article, written by our Technical Director David Ashby, which was featured in IRSE News (Issue 329). In it, David challenges the industry to move away from incremental overlay strategies and instead embrace a blank sheet design for ETCS Level 2.
Article highlights:
-
The vision: A Big Bang transition to ETCS L2, removing lineside signals entirely.
-
The benefits: Significant CAPEX/OPEX savings, enhanced trackside safety, and faster benefit realisation.
-
The question: Is incremental change fast enough for the modern rail landscape?
To read the whole article see below
